
SGT-400 Units 1 & 2 Flushing Activities Successfully Completed
Successful completion of flushing activities for SGT-400 Units 1 and 2 at Sabratha Platform, including site preparation, fluid handling, system flushing, inspection, and completion support by the Petrolead technical team.

Advanced SGT-600 Gas Turbine Combustion Chamber Repair, Refurbishment & Manufacturing Solutions
Specialized repair and refurbishment support for SGT-600 gas turbine combustion chamber components, including inspection, NDT, cleaning, repair welding, cooling hole restoration, dimensional verification, quality control, and certification support.

NDE Operations & Centrifugal Compressor Service Inspection
On-site technical inspection of a centrifugal compressor unit, including internal component checks to support equipment integrity, operational safety, and long-term reliability.

Unit C – Dresser-Rand Centrifugal Compressor Testing, Commissioning & Handover
Final testing, commissioning, mechanical inspection, and successful handover of Unit C Dresser-Rand centrifugal compressor at Wafa Field.

SGT-400 Units 1 & 2 Flushing Activities Successfully Completed
Successful completion of flushing activities for SGT-400 Units 1 and 2 at Sabratha Platform, including site preparation, fluid handling, system flushing, inspection, and completion support by the Petrolead technical team.

Advanced SGT-600 Gas Turbine Combustion Chamber Repair, Refurbishment & Manufacturing Solutions
Specialized repair and refurbishment support for SGT-600 gas turbine combustion chamber components, including inspection, NDT, cleaning, repair welding, cooling hole restoration, dimensional verification, quality control, and certification support.

NDE Operations & Centrifugal Compressor Service Inspection
On-site technical inspection of a centrifugal compressor unit, including internal component checks to support equipment integrity, operational safety, and long-term reliability.

Unit C – Dresser-Rand Centrifugal Compressor Testing, Commissioning & Handover
Final testing, commissioning, mechanical inspection, and successful handover of Unit C Dresser-Rand centrifugal compressor at Wafa Field.